As a shoring designer, I'm running into some clients and consultants who won't allow pressure treated (.4 pcf per AWPA guidelines) 3x12 DFir wood lagging to remain in the ground, citing potential voids and resulting soil subsidence. This is particularly problematic when the lagging is used as a backwall form. Any experience out there pro or con this ? (To DRC1 & PEinc, I've read your postings of Feb. 3, 2004. Thanks.)