AndreChE
Chemical
- Jul 10, 2003
- 126
Dear all
Our C2 and C3 Splitter are with very high DP.
For the C2 Splitter, we have checked all the pressure profile along the column and we know in which section the flooding is located. We were suspecting ice/hydrates but we collected greenoil in the bottom level indicator nozzle.
The column was revamped with new trays, more capacity. At the moment it is distilling onspec bottom and top products just with a very high DP than expected.
For the two C3 Splitters, the situation is diferent. THe columns were not changed. They were hydrotested and closed.
When we started up the plant we experienced very high DP along both columns, with values in which was not possible to distill in the past. However, the situation still remains and both top and bottoms are onspec. Our maximum DP was 700/800 mbar and now we have 1200/1300mbar for 178 trays in each column.
We will perform gamma scanning for these 3 columns. My question are:
- Which conditions should we put the columns for the scan? Max possible load? We already have very high dp but they are distilling. High/low reflux? High/low reboil?
- Were can I learn more deeply how to analyse gamma scan plots? I have read everything in Kister's books and some small papers but I feel I need to study deeper in order to fully understand quickly those plots? Any papers or articles on the net or journals? Any specific book or documentation? The tests will be performed next week.
Thank you all
AndreChE
Our C2 and C3 Splitter are with very high DP.
For the C2 Splitter, we have checked all the pressure profile along the column and we know in which section the flooding is located. We were suspecting ice/hydrates but we collected greenoil in the bottom level indicator nozzle.
The column was revamped with new trays, more capacity. At the moment it is distilling onspec bottom and top products just with a very high DP than expected.
For the two C3 Splitters, the situation is diferent. THe columns were not changed. They were hydrotested and closed.
When we started up the plant we experienced very high DP along both columns, with values in which was not possible to distill in the past. However, the situation still remains and both top and bottoms are onspec. Our maximum DP was 700/800 mbar and now we have 1200/1300mbar for 178 trays in each column.
We will perform gamma scanning for these 3 columns. My question are:
- Which conditions should we put the columns for the scan? Max possible load? We already have very high dp but they are distilling. High/low reflux? High/low reboil?
- Were can I learn more deeply how to analyse gamma scan plots? I have read everything in Kister's books and some small papers but I feel I need to study deeper in order to fully understand quickly those plots? Any papers or articles on the net or journals? Any specific book or documentation? The tests will be performed next week.
Thank you all
AndreChE