PRECAST column width around 2m height around 7m.
- is using rebars as lifting system is an option?
- available column vertical reinforcement: any contribution from them for resisting cone failure?
- proposed arrangement appreciated
- - what is recommended edge distance
1. Due to some incident on site some angles and beams were twisted around 20degrees.
Can these members retained on site retained to their original shape without effecting assumed elastic properties, procedure?advise?
REINFORCED FIBER PLASTIC in telecomm. industry.
one supplier proposing the material on 15m rooftop tower.
is it doable?
experienced Engineers in this field need their help
Reinforced handhole in a pole
1 40cm dia pole,thickness 8mm hole 15*15
Case 2 1m dia pole thick 10mm hole 20*20
What tyoe of welding recommended between pole and reinforcement. Note reinforcement rim depth around 8cm