Recent content by adam08285

  1. adam08285

    Constant Spring Hanger Vertical Angle Greater Than 4 Degree

    In my case, the horizontal movemnt is the 158mm and offset about 79mm.the vertical angle obtained is 4.4.according to mfr, their spring design can cater up to 5 degree. I am curious about the last sentence of the mentioned requiremnt mss sp 69 above.do we need to check anything related to stress?
  2. adam08285

    Constant Spring Hanger Vertical Angle Greater Than 4 Degree

    Guys, [peace] According to MSS SP 69, "If horizontal pipe movement results in a vertical angle of the hanger rod greater than 4 degrees, common practise is to either offset the pipe attachment or structural attachment by the amount of anticipated rod swing or provide a traveling device for...
  3. adam08285

    Constant Spring Hanger Setting During Commissioning

    Thanks guys for your knowledge and experience sharing. It would be helpful for me and others as well.
  4. adam08285

    Constant Spring Hanger Setting During Commissioning

    Hi guys, For constant spring hanger (lug attached to a structure case), we will carry out cold setting as per stress designed during cold condition before the piping is put in service. In commissioning stage, which by right the locking pin has been removed, the supported pipe will travel up to...