I have problem at my instrumentation wiring from field to marshaling cabinets.
because of some trouble at detailed engineering, we should mix instruments that role as PCS and ESD to one JB with two multicable out. (of course it is out of client spec)
data i got are:
1. all...
gr2vessels yes, the clearance based on the design should be more than 49 mm. But the result as it already installed. The clearance became only 49mm. Finally, we put additional material for this bottom drain.
1. blind flange with drill hole 1/2" nptf (+/- 9.6mm)
2. elbow, 1/2" nptm (+/- 36mm)...
Here is the sketch I got from mechanical datasheet. The detailed CAD file is server secured.
Seems like we have mistake at the design (very short at the bottom), but I dont have deep understanding about vessel design.
If we use tubing and fitting to cover drain system, is it high or low...
gr2vessels : the vessel is rich glycol exchanger. And the photos attached on the link. The problem is at bottom nozzle which is already installed by flange, and can not be cut because of the fabrication certification (manufacture permit matter). The clearance reported from site is only 49 mm...
Guys,
I have a problem with my rich glycol exchanger drain line. I have this vessel already stand above platform, and the space length from bottom flange (for drain) to floor is only 49mm. My piping engineer suggested to configure the bottom drain to be: