Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations SSS148 on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Recent content by Benk713

  1. Benk713

    Epoxy Grout Sampling and Testing (ASTM C579)

    How many compressive test samples are required for epoxy grouts to form a "valid test"? ASTM C579 is the standard to use for testing epoxy grout, but all it says it to create 6 samples. It's not clear to me if that means a minimum of 6 samples must all be tested at the same age to form a valid...
  2. Benk713

    Deficient Clear Cover Repair Method

    I came across this product in my research and I think it should do the job. http://kemper-system.com/US/eng/systems/kemperol-waterproofing/ Thank you for pointing me in the right direction. For some reason I forgot to read the commentary of the minimum clear cover section in ACI. That got me...
  3. Benk713

    Deficient Clear Cover Repair Method

    Yes, it's the top cover. Is there a waterproofing material that anyone is familiar with that might work for below-grade concrete protection?
  4. Benk713

    Deficient Clear Cover Repair Method

    ACI 318 section 7.7.1 specifies a minimum clear cover of 2 inches for concrete exposed to earth or weather for bar sizes 6 through 18.
  5. Benk713

    Deficient Clear Cover Repair Method

    I'm working on a project with a very large reinforced concrete footing. The minimum clear cover on top of the foundation was specified to be 2 inches, but in some areas of the foundation the contractor placed the concrete unevenly and only achieved as little as 1 inch of clear cover. The...

Part and Inventory Search