Thank you for your inputs.
The study will be conducted by a US firm in a city in Mexico right in the US border where, to begining with, no topographical data in electronic format exist. I got from another source that just the geo study for 2 miles of levee is about 100K which match the...
I am working as cost engineer and something came to my table that really seems more a joke than a serious work. I received a man-hour estimate for a scope of work for producing a FEMA type flood map for 640 acres, the global stability analysis for 2.5 miles of levee, dam breach analysis, levee...