The chlorine mixture is held in a crock with a 2 to 1 ratio ( 5 gal chlorine to 10 gals of water). The water is pumped from the well into a 30,000 gallon holding tank. The configuration I saw was the line from the chlorination pump was hooked into the water main on the discharge pipe of the...
Is it normal to hook the Chlorine injector line to piping after the holding tank and the chlorination pump is activated by a flow meter looks like a cob job? Is it not the norm to inject Chlorine directly into the holding tank? What is the down side to hooking the chlorination line into the...