The scenario I'd like assistance on is as follows: There is a Waste Heat Boiler attached to a Steam Methane Reformer and uses the Flue gas from the SMR to generate steam required for the reforming process. The area of concern in the WHB section is the Steam Generator section which consists of 50...
Thank you very much for the responses.
The wrapping was done to the pipe due to low wall thickness and wrapped as per ASME PCC-2 allowance.
The main concern is regarding the temperature cycle that the wrapping would experience which was not initially intended/designed for.
LittleInch, I...
Good day,
I'd like to find out if anyone has experienced a similar situation and has some advice. There is a line on the plant that is currently wrapped. The wrapping was done on the run and at temperature. Initially, the line was meant to be replaced at the next shut down, but was then...