Thanks Dan and LittleInch.
And LittleInch, regards your question, yes they will certainly run further to the right of the curve. But its 2400 litres/minute for each arm if you do the conversion and computation.
Hi guys,
I have a bit of a problem with a system I've been analyzing these past few days. Please see attached images. The system consists of a tank feeding to 3 centrifugal pumps (pumps are at an elevation below -5m of the tank foundation). These 3 pumps rated at 576cu.m/hr discharge 12 loading...
Hello comrades,
I have 2 questions.
1. I'd wanted to know. How is life span of a welded storage tank factored into the calculation of the shell plate thickness according to API 650
2. I discovered quiet recently that shell plates that were stored in the open and had been sandblasted...
Yes LittleInch,
It is indeed 240 degrees celcius. And yes I have confirmed that it will be 4 x 2" pipeline clamped onto the 12" pipeline at 12, 3, 6, and 9 o'clock respectively. Actually during operation only two heat tracing line will be heating up the core pipe at any point in...
Thank you LittleInch and Saplanti ,
Great point. Alternatively, what if you had two 2" pipelines serving as hot oil heat tracing. Will there be contribution to the stiffness of the 12" pipe? In that case, what will be your approach?
Dear 7.0,
Exactly why I am requesting assistance on how to model both pipes and simulate conditions. Do you have any idea how this can be done on Caesar II?
Hi 7.0,
Sorry. The following will answer your queries;
1. Yes it is a 12" pipeline bitumen passing through a culvert. Please ignore the soil above it.
2. Operating temperature is 240 degrees celcius.
3. The 12" pipe is sch.40.
4. The 1/2" pipe is a conduit for hot oil and clamped onto...
Hello guys,
Please I need some assistance on how to model a 12" bitumen pipeline heat traced with a 1/2" pipeline as shown in the attached image on Caesar II. I am particularly used to modelling and analysing single pipe systems but this has somewhat become a challenge for me. I will...
Hello guys,
My company intends on undertaking API 653 tank inspection on our above ground storage tanks and I have been tasked to draw up a tentative schedule for the intended activity. I will be grateful if anyone could send me a sample for reference. Thanks in advance.
And another point to note is, there will be an actuator to control the limits of closing and opening. I don't want to focus on the automation aspect now. Just the civil and mechanical aspects as well as the motor.
Thanks fellas