Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Recent content by DEBASIS BARMAN

  1. DEBASIS BARMAN

    Anyone having spreadsheet to check

    Anyone having spreadsheet to check CBP wall stability against Circular Failure of Soil Slope, please share. I have to design Pile Wall to retain 10m height slope in cohesionless soil. Piles are spaced at 1.5m c/c.
  2. DEBASIS BARMAN

    Anyone having spreadsheet to check

    Anyone having spreadsheet to check CBP wall stability against Circular Failure of Soil Slope, please share. I have to design Pile Wall to retain 10m height slope in cohesionless soil. Piles are spaced at 1.5m c/c.
  3. DEBASIS BARMAN

    Self Drilling Anchors

    14m wide modified Horse Shoe Tunnel is being constructed in RMR Class V rock. Rock Overburden is around 30m. We have proposed SDA bolts of 32mm dia, 8m long @1.5m c/c in systematic pattern. Contractor is 1st installing steel sections as rigid ribs and encasing the ribs in shotcrete. Further they...

Part and Inventory Search