    Stator Earth Fault Detection Scheme

    For our 14.9 MW hydropower project, we have two 9150 kVA, 0.85 pf, 6.6 kV (well theoretically??)identical salient pole generators connected directly to a bus bar. The bus bar is then connected to a delta-star configuration of three single phase 6.6/33 kV step up transformers with 33 kV side...