For the detail I am doing, the wood on top of the steel will not be a nailer. I only nail the plywood to the 2x8 rafters. So if I use hangers, it will be face mount hangers. The roof is 6:12 slope. If we do the notch you were suggesting, they have to notch both top and bottom. They have...
I have a project where I have those crazy slim overhang roof. It cantilevers 8.5 ft with 75 psf snow load. I end up using W8 steel beam spaced at 5 ft on center (3.5 ft projected with the slope). Then I have 2x8 spaced at 24" o.c. that connect from steel bm to steel bm. I am considering...
just throwing out ideas. If you use HU210 and redo the connection, you can weld the part touching the steel (bottom and top flange). Perhaps add plywood spacer to make the hanger more flat. HU210 also projects farther so the joists will sit more on the hanger.
Sometimes I specify concealed face mount hanger to the king stud and not use jack stud. There is no published value for load going that direction though but it would be a lot stronger than end nailing to the grain. I feel like the capacity shouldn't be that far off from the vertical load capacity?
Do you guys have a detail you can share how you frame deck column with natural stone veneer (6" thick including mortar) all the way to the top and above the deck? I never like this scenario and it is very hard to transition from concrete pier, to column to wood with stone around it. In the...
For example, shall I stop and start the framing before and after the rafter? Try to balloon frame it? Mix? Trying to figure out the best detail. Balloon framing, the studs get really long and may have to go with engineered wood.
Lets say you have 6:12 shed roof. In the middle this roof you have a fireplace. How do you typically frame this? The fireplace will have thin set stone veneer, but the chimney above will be about 7 ft tall and will have heavy stone veneer. The chimney framing and fireplace framing will be...
I do calc but I dont submit them. I have the calculation files but I dont create a calculation bundle with title block and table of content. The counties don't require the calcs. They just want stamped drawings.