Here is the scope of work:
Trenching through silty frozen ground with existing rigid polystyrene insulation about 2 feet down. Trench depth of 3.5 feet.
Laying in cables and then replacing the insulation damaged from trenching.
Backfilling with native soil.
Water necessitates doing the work in...