Hi Enable,
Appreciate the detailed reply!
The existing slope is random; water eventually drains due to the deflection of the slab over the southern edge. There is about 50mm (2") available for falls without affecting doors etc, hence worst-case 40mm (1.5") for a new system/topping etc at 1% on...
Hi All,
Would love any thoughts/better ideas on this predicament, especially if anyone has dealt with a similar situation in the past:
Existing Scenario:
100mm thick suspended slab (combination of open balcony/partial kitchen above, low head-height garage below)
Simply supported 3.7m span to...
Hi All,
Would love any thoughts/better ideas on this predicament, especially if anyone has dealt with a similar situation in the past:
Existing Scenario:
100mm thick suspended slab (combination of open balcony/partial kitchen above, low head-height garage below)
Simply supported 3.7m span to...