  1. Giovanny V

    Construction line for a2 and ? of Figure UW-13.2 Sketch (r) and (s) BPVC VIII D1

    Mike, this is the way that I was working, thank you for you support. Giovanny V.
  2. Giovanny V

    Construction line for a2 and ? of Figure UW-13.2 Sketch (r) and (s) BPVC VIII D1

    Thank you Mike. But I need some more specific. See the image below: Giovanny V.
  3. Giovanny V

    Construction line for a2 and ? of Figure UW-13.2 Sketch (r) and (s) BPVC VIII D1

    thread794-467605 Hi. I need your guide to define the start or finish point of the construction line for parameters a2 and θ in Figure UW-13.2 sketch (s) BPVC Section VIII Division 1. UW-13 (f)(6)(-b) indicates: "The dimension a2 shall be measured from the projected surface of the plate being...