Hi all,
First post in a very long time on a new account - lost my old login.
AMS-A-22771 calls out "4.4.5 Prior to penetrant inspection, each forging shall be etched (See 4.4.4), dried (See 4.4.4), and penetrant inspected (See 4.3.2.1.2) in accordance with ASTM E 1417". ASTM E 1417 indicates...