Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Recent content by JFMPE

  1. JFMPE

    Pipeline Drilled Pier Support Design

    Thanks for you comments. This equation was used by a geotechnical engineering firm (now gone)for a similar project very close to the project site, with identical soils reports, so it looked like a decent start. They were the ones who used the 1.33 factor to the loading conditions. The...
  2. JFMPE

    Pipeline Drilled Pier Support Design

    I am designing the pipeline and support system for a 20" diameter hot water (315 psig, 215 deg. F) pipeline. The pipeline will be above ground on 8" diameter pipe piers in 36" diameter drilled holes to various depths. This is a standard design for this type of application in this plant, with...

Part and Inventory Search