Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations The Obturator on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Recent content by jocey30

  1. jocey30

    P.E Civil- Structural

    Thank you Cal91. I hadn't heard about the other website before. thanks.
  2. jocey30

    P.E Civil- Structural

    Has anyone taken the P.E civil- structural this Oct, and passed. How many hours did you study for per week? Any practice tests for the structural test? Also, is it worth paying for the PPI exam café- are the questions close enough to the test for the AM and PM portion.
  3. jocey30

    Repair for holes drilled in 2x10 floor joists

    Thank you both for your comments. I will post more information as I find out.
  4. jocey30

    Repair for holes drilled in 2x10 floor joists

    I am reviewing a repair detail for holes that was drilled through 2x10 wood floor joists, spanning 14', 16"o.c spacing. Hole that was drilled is approximately 4" in diameter and I think at the center of the joist. The repair detail shows 2"x2" SYP fastened to top and bottom of 2x10 floor joists...
  5. jocey30

    Wood Shear Wall on hollowcore plank.

    Thanks Mike and KootK 1. The shear load transfer was not specified. I would think that needs to be specified and designed for, because of the presence of hollow space. Reduced shear capacity compared to a solid slab. 2. Yes, the cores are grouted and the prestressing strand is at the bottom...
  6. jocey30

    Wood Shear Wall on hollowcore plank.

    I am reviewing an apartment building. It is 3 stories with a basement. Hollow core planks are the grade level, supporting 3 floors of load above. The lateral system is wood shear wall (in the interior and perforated wall on the exterior), that bears on hollow-core plans (8" and 12"). The EOR has...