With regard to Wind Turbines, please name any specific electrical performance standards (e.g. power quality, etc) you know of that a Transmission Grid Operator requires from the turbine manufacturer to satisfy in order to allow connection of the wind turbines to the grid.
Your response is very...
Underground medium voltage (33 kV) cables are to be laid in trenches to connect the 50 individual wind generators of 2 MW each to be erected in a wind farm / park.
The wind farm covers a hilly area of approximately 3 km x 3 km and the trenches are to be excavated along one side of the earthen...