Hi
Sorry for slow respond.
You are right with everything.
Everything has to be for 2 year event 2.90"/hr. The site is 3.108 ac, grassy field with flow path 330 ft (from SE to NW) CN=39, slope 1.3%, TC= 2.4 min. On the edge of the property there is a ditch (is going a round the property S to E...
hi
This is great forum. I'm new to Hydrocad and i have a issue with a infiltration. I have a parcel 3.108 ac. in central Wisconsin. Wisconsin code stands that for high imperviousness sufficient runoff volume of the post- development infiltration volume shall be at least 60% of the...