Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Recent content by noypeng

  1. noypeng

    Anybody in the group who has an ide

    Unfortunately that's the only info I got. The building is in Yukon. Thanks.
  2. noypeng

    Anybody in the group who has an ide

    Anybody in the group who has an idea who manufacture this metal deck..the flute is 1.5". The building was built in 1967. Thanks!https://files.engineering.com/getfile.aspx?folder=f7d1b55a-76d4-499d-82cf-2c728ab1e9b9&file=Document1.pdf
  3. noypeng

    Is ST4B5 beam the half or 8B10 beam

    Is ST4B5 beam the half or 8B10 beam? Thanks
  4. noypeng

    Old steel joist by Dominion Bridge

    @jayrod12 Thank you so much! @dik, I tried to google a copy of the catalogue but I can only find one at the Univ. of Alberta library which I don't have access.
  5. noypeng

    Old steel joist by Dominion Bridge

    @CANPRO, the building that is in Yukon. When I did my search yesterday I came across about that Robb joists being reviewed in NL..
  6. noypeng

    Old steel joist by Dominion Bridge

    I'm looking for some info for 22D10 steel joist by Dominion Brdige. The building was built in the 60's. Thanks
  7. noypeng

    Installing piles using a plate compactor

    Ron - I think that's what engineers do, find a solution until there's none before you say HELL NO?
  8. noypeng

    Installing piles using a plate compactor

    oldestguy - checking elevations for differential settlement is a good idea but that means either stamping the drawing now and take the risk so they can get permit or wait after a couple of years to monitor it. Btw, had a good laugh with that "garden hose filled with water", reminds me back...
  9. noypeng

    Installing piles using a plate compactor

    SlideRuleEra - In the first attachment "compactors.jpg", there's an inset photo of the compactor attached to the track hoe hence I put "not the exact model of the track hoe" in my previous email.
  10. noypeng

    Installing piles using a plate compactor

    Here's what they used to install the pile (not the exact model of the track hoe) https://files.engineering.com/getfile.aspx?folder=bc2cad5c-0ffe-4d7c-af2b-c77249dc4f00&file=Compactors.JPG...
  11. noypeng

    Installing piles using a plate compactor

    Any idea then on how to check the pile capacity based on the attached pile log other than a load test? My supervisor just had a meeting with the contractor and he was told that the ground was pit run. Now I wonder how he was able to install the 4" pipe 27' into the ground without damaging it.
  12. noypeng

    Installing piles using a plate compactor

    MTNClimber, I have no clue how they did it. We were just provided with pile logs for us to check the pile. Unfortunately, it's getting common here now that people build without any permit, and only get engineered drawings when caught by authority.
  13. noypeng

    Installing piles using a plate compactor

    The piles are in the ground. The building sits on top of it already. If I were to start from scratch, I could have recommended driven pile or screw pile.
  14. noypeng

    Installing piles using a plate compactor

    See attached pile logs. It says "refusal" but I don't know how to quantify the pile capacity. There is that possibility that there's a "mismatch" between the compactor, or not enough energy to drive the pile or less efficient\cy so you get early refusal...
  15. noypeng

    Installing piles using a plate compactor

    It's a pile foundation for 3 log cabins. Pile diameter and embedment ranges from 4"-10" (sch 80) and 19' to 34', respectively. We were retained to provide engineered drawings after an inspector found out there were no permit drawings.