It depends on the conditions of the slurry and the machines involved (pumps, dryers, filters, centrifuges etc.)
Generally slurry lines need to be routed with maximum slope so that they are self draining. No pockets, dead ends etc.
Flush connections with minimum distance have to be foreseen...