Hi everyone,
do you know if it is possible to use waste heat from open cycle gas turbine in a recovery boiler, instead of steam producing water (probably for district heating, that is max 130 deg C at about 8 bar). The expected nominal power of the gas turbine is 22 MW, and heat recovered from...
What properties of steam do you need for this? Do you use any software for simulation, or is it rather rough, "hand" calculation for one case?
I sometimes use website steam tables when I have relatively simple case to calculate in my work, for example check calculations. But for more in-depth...
Thanks for your valuable comments. The design code is EN 13480-3. I do not know the reason why contractor wants to use flanged connections on valves. Maybe unification of supplies, as all - or at least most of - other valves (eg. on turbine bleed pipings) are flanged, or just experience / habit...
Because i ususally find elements that are not started from 1, and also these are various variables, ie. m.4, m.7, m.8, m.9, h.7, h.9 etc. Above was just an example.
Tees are not mentioned in Technical terms of reference - this can be a flaw. The system is not going to operate in high cycling regime, and there are no seismic shocks on the location. I do not care about the money - this is not my money, the contract is already awarded, and remuneration is...
Can you please attach an example or explain more detailed? I used to assign Find to a column vector, ie. (origin 1)
|x[1|
|x[2|:=Find(x.1,x.2,x.3)
|x[3|
Thanks for help.
In fact we are the Contract Engineer for this project (I think this means the same as your "Contract Administrator"). The plant is located in eastern Europe. The construction company works under contract agreement, not "sub-contract". The obligatory piping design code is EN 13480-3 (probably the...
Thank you guys for your reply. Pennpiper, the problem is that I do not know if I (or we, as a company) have a "tool" to force the contractor to use tees. Technical terms of reference do not talk about this issue (at least not directly - there are mentioned standards such as EN 13480 etc.). So...
Hello all,
Currently the company I work for services as technical advisor for the construction of CHP plant. The contractor, instead of joining perpendicular pipes by tees (T-elements), is going to join pipes as "pipe in pipe". This is regarding for example steam bleeds / extraction pipings...
Hello all,
I work for the company that is currently technical advisor for the construction of CHP plant. The contractor wants to use flanged valves on the live steam piping DN200 PN100, 40 bar, 400 deg C. From my information, welded joints shall prevail. Can you tell me what is your opinion...