    FRP/ GRE Flange Leakage Check

    I am currently conducting a stress analysis of a fiberglass FRP/GRE piping system using CAESAR II software. As part of the analysis, I need to perform a flange leakage check. Could you please advise on how to carry out this check, either using the software or manually, and which method should...
  2. PIPING_DESIGNER

    API 650 NOZZLE CHECK

    Please, I am looking for an excel file that can be used to check the nozzle load according to API 650 ANNEX P. I wish you would help me.
  3. PIPING_DESIGNER

    Jacketed buried pipeline stress analysis

    - The pipeline crosses a public land. - The distance between pig launcher and pig receiver is about 1500 m.
  4. PIPING_DESIGNER

    Jacketed buried pipeline stress analysis

    I have to carry out a stress analysis of jacketed pipeleine carrying crude oil from pig launcher to the pig receiver (pig launcher and receiver are above ground) The pipeline connecting the start point (pig launcher) and the end point (pig receiver) is buried (underground) and jacketed. - Inner...
  5. PIPING_DESIGNER

    Jacketed buried pipeline stress analysis

    - Nitrogen gas in the outer pipe - Two pipes are jacketed
  6. PIPING_DESIGNER

    Jacketed buried pipeline stress analysis

    I have to carry out a stress analysis of jacketed pipeleine carrying crude oil from pig launcher to the pig receiver (pig launcher and receiver are above ground) The pipeline connecting the start point (pig launcher) and the end point (pig receiver) is buried (underground) and jacketed. - Inner...
  7. PIPING_DESIGNER

    Stress analysis of GRE pipeline directly laid on the ground

    I have to make the stress analysis study of a pipeline that is not buried but it is directly laid on the ground. how to model this pipeline on CAESAR II.
  8. PIPING_DESIGNER

    GRE PIPE MANIFOLD STRESS CALCULATION

    In my opinion, I think supporting valves from their flanges is more safe for the GRE piping system than supporting from the pipes. what you think for a DN100 GRE piping system ?
  9. PIPING_DESIGNER

    GRE PIPE MANIFOLD STRESS CALCULATION

    Our client ask for a change of carbon steel pipe manifold by a GRE/GRP pipe manifold. The question is how to support valves to withstand the excess of load on manifold piping system? Should I support valves from their flanges or from pipe. GRE PIPE DN: 4 INCHES Carbon steel valves class 150
  10. PIPING_DESIGNER

    Polypropylene (PP-H) Thermal Expansion Coefficient

    According to polypropylene PP-H pipes suppliers, the coefficient of thermal linear expansion is equal to 50*10^-6 in/in/F at 73°F. Could you please give me this value at 176°F ?
  11. PIPING_DESIGNER

    Polypropylene creep curves

    You mean that Ec is the creep modulus at 120°C with an applied stress of 1 N/mm2 during 1000 hours of test ????
  12. PIPING_DESIGNER

    Polypropylene creep curves

    In the diagram of polypropylene creep curves, what is the meaning of the indicated values EC=140N/mm2, 1N/mm2 and 1000h