    Termination of EOL (End of Line) Devices (Smoke Alarms)

    Thanks so much guys. I am going to design it as terminated in the base, but there is a box only a few meters away, if it doesn't fit Ill get them to move it to the box. Thanks again!
  2. Steve1919

    Termination of EOL (End of Line) Devices (Smoke Alarms)

    Hello All, Had a quick questions regarding EOL devices. The fire control panel I'm using calls for an EOL capacitor (50uF, 50V) but gives no detail on how or where this should be located. I looked through a few standards and the Canadian Electrical Code, but can't find anything. The capacitor...