  1. swan2

    HV Power Cables sheath bonding

    We are installing 66 kV single core power cables 400 mm2 copper approximate route lenght of one kM. Cables will be installed on cable tray on part of the route and direct buried for the remainder. System fault levels single and three phase are around 15 kA. The question is what type of...