Dear Expert,
My client ask me one question, "What would be the result of using temperature 1300 Deg C in heat treament for Carbon Steel". Pls advice me to answer this question.
Dear Sirs,
My welders qualified SMAW/FCAW process, SMAW use for Root pass only. This welders can weld full FCAW process with backing or not.
Code Apply: ASW D1.1
Dear Gents,
Refer QW-253 when CVN require, We "change" Holding Time of PWHT is Essential Variable. Refer QW 407.2 i know that maximum holding time of PWHT of WPS = 1.25xPQR.
So How about Minimum Holding time? We afollow record in PQR or follow ASME B31.3, 1 hours/in.
Dear My Friends,
My project have to qualify 1 PQR between Super Duplex A790 UNS 32750 to Super Duplex A790 UNS 32760. Mechanical test require:
1. Pitting Corrosion at 40 Degree (No Pitting)
2. Range Ferrite: 35-65%.
3. Max Hadness 350 HV10
I am wondering which consumable we...
I have Pipe CS A106 thickness 25mm + 3mm Overlay 316L designed follow ASME B31.3. I know that when we design ASME B31.3 all Carbon Steel material have thickness above 19mm shall be performed PWHT. But i don't know Carbon Steel + Overlay need to perform PWHT or not. What range temp PWHT? What...
Dear Sir,
I don't know when we perform PWHT abobe the upper transformation Temperature. Normaly I see that PWHT at 500-600 Degree which below the lower transformation temperature.
Dear Sir,
I have 1 PQR with thickness base metal 25mm, No require CVN, Have PWHT, Qualified follow ASME IX.
So i can develop 1 WSP with max range thickness 200mm with the same Temp and Holding time PWHT in this PQR.