Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations pierreick on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Recent content by zubair2930

  1. zubair2930

    part winding motor testing

    thanks for the affirmation then
  2. zubair2930

    part winding motor testing

    well thanks for correcting me but still my concern is unsolved :)
  3. zubair2930

    MCCB in place of a disconnector

    Dear All, Sometimes when I go to the field, I find that sometimes they have installed MCCB in place of a disconnector to the supply side of a three phase machine. Is it a safe practice or they should install disconnector there and I should point it out as a safety violation ??
  4. zubair2930

    part winding motor testing

    and why would you be needing that ???
  5. zubair2930

    part winding motor testing

    I received a complaint of a faulty part winding motor. well, the motor i am dealing with has 6 terminals and its diagram is attached. i checked the winding terminals with a multi-meter and i found out that there was no connectivity between terminals 1 and 2 and I gave the report that that...

Part and Inventory Search