I have a 1" NPS x 70" Schedule 80 steel pipe vertically cemented in the ground. A force is applied at the top of the pipe at a 45 degree angle downward.
A deformation happened at the very bottom of the pipe, the cement did not fail. The pipe failed from one side in tension and the other in...
I have a 1" NPS x 70" Schedule 80 steel pipe vertically cemented in the ground. A force is applied at the top of the pipe at a 45 degree angle downward.
A deformation happened at the very bottom of the pipe, the cement did not fail. The pipe failed from one side in tension and the other in...
While removing gas hydrates. A vent pipe is connected by threads to a balon ball valve that is connected to the gas lift meter run. The vent pipe is vertical and is 69" with a 45 degree elbow at the end. Everything is schedule 80 steel 1" nominal. When the ball valve was opened all the way, the...