Dears
The contractor remove (strip) the formwork beofore assigned time.
Whats is the needed tests and measurement to check the slab, and ensuring that no defects or serviseability problems occures.
And if there is a reference for codes or handbooks, please speicify.
Thanks
Dears
Please specify the typical ranges of natural moisture content of soil types with the division from dry to moist to wet to saturated.
Please specify the reference standard/handbook or link.
Thanks