Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. Kevin8686

    Sematic HMI 1st Generation KTP400 Basic Mono NP Migration to 2nd Generation KTP 400 Basic.

    Dear engineers, My Sematic HMI 1st Generation KTP400 Basic Mono NP is broken, i have the back up file which is in .psb format. I already purchased the second generation which is KTP 400 Basic. I tried to migrate the HMI project which is the backup file in .psb format by using Wincc and also...
  2. Kevin8686

    ABB VFD ACS800-01-0030-5+D150+E200+L502+N653 +P001

    Dear Sirs, I hope this thread finds you well. We have a ABB VFD ACS800-01--0030-5+D150+E200+L502+N653 +P001 , some parameter groups do not show up on the local control panel, the only parameter groups that show are 10, 11, 14, 16, 33 the rest do not show. And also the language selection...
  3. Kevin8686

    Urgent Urgent - WEFU / WEICHIA / Engine Speed Controller - Model No. 100 1904 116A

    Dear Engineers, I urgently need the manual as well as the control signal line diagram for WEFU / WEICHIA / Engine Speed Controller - Model No. 100 1904 116A. It's a part of Diesel Genset. Kindly check the attached nameplate photos for the Genset as well as the speed controller. The details...
  4. Kevin8686

    Hello dear fellows, I need your

    Hello dear fellows, I need your help please, A power generation plant consists of 3 steam turbines each ( 4.8 MW - 6600 V - 50 Hz ) these turbines feed a network of an oil facility which demand currently 7 MW and when all equipment it demands 11 MW but mainly demand 7 MW. This power plant is...
  5. Kevin8686

    Standby Generator used as Continues Generator

    Hello everyone , I am a new power plant operator and I need your consultation please, What will happen to 5.7 MW / 4.16 KV / 60 HZ Standby generator used as Continues Generator. It will be loaded with 1.5 MW Winter time, And 2.5 MW Summer time. For unlimited number of hours for the next 4...
  6. Kevin8686

    Solar Turbines, MPU T60

    MR. DTR, They are owned by Caterpillar Are you Gen-set commissioning engineer ?
  7. Kevin8686

    Solar Turbines, MPU T60

    Hello everyone , I am looking for a commissioning engineer specialized in Solar turbines T6o. Please anyone with such skill please get in touch. Best regards,
  8. Kevin8686

    New power plant project, Nameplate Mistake !!!

    The prime mover is a gas turbine and the generator output capacity is 5.7 MW. It`s supposed to be continuous but the nameplate says it`s standby !
  9. Kevin8686

    New power plant project, Nameplate Mistake !!!

    Good morning everyone , I need your urgent consultancy please ! We are in the line of installing and commissioning a new 5.7 M.W power plant. The unit arrived on-site but the CRITICAL ISSUE is the generator duty type !!! It is supposed to be continues but the nameplate says it is Standby ...
  10. Kevin8686

    Hello all, Would you please tell

    Hello all, Would you please tell me if you know Is Limiter manufacturers other than ABB Calor EMAG, for current limiters 11000 V, 3000 A, 50 HZ Best regards, Kevin.

Part and Inventory Search