Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. Cairo Datum

    Limit of Shallow concentrated flow

    Hello! Are you designing a new site or evaluating existing? a) New site: Does this mean that after 400', the flow has to be intercepted by a channel or inlet? In this case it falls back on you to design it I suppose, but that would be an unconventional restriction. b) Evaluating existing: I...
  2. Cairo Datum

    Raising the inside floor of a Catch Basin 2"

    Where I'm at it's standard to use flowable fill when abandoning structures but lightweight concrete for this type of application. We had to raise the bottom of a manhole 3 ft once and used lightweight concrete. But yes, like the others said with this small of an invert change just leave the sump...

Part and Inventory Search