@david339933
No, I didn't miss that part. I didn't post that part simply because those exemptions are applicable whether or not the PWHT is due to service or another part of the code. I base this off of an ASME interpretation below (question 3). Although the interpretation is too old, and I am...
@ Krausen
the preaheat is required if the nominal thickness (weld thickness) is greater than 1.25", isn't it correct? so why would you think it is required?
Thank you for your reply but what about the UW-40(f)(5)(-f) that states the nominal thickness is the thickness of the weld at the point of attachment when a non-pressure part is welded to a pressure part? The weld thickness in (1) is 0.75" and it is less than 1.5" which requires PWHT (if...
Hi everyone,
I am trying to figure out whether PWHT (Post Weld Heat Treatment) is required per code for non-pressure parts welded to pressure parts under the following conditions:
The material is P1 Gr.1 for both the pressure part and non-pressure parts. PWHT is not required for service.
1)...
Hello everyone,
I am using ASME SEC VIII Div.2 rules per appendix 46 div.1 for nozzle reinforcement calculations in a Div.1 vessel. The nozzle is a custom forging (stub end) with a heavy barrel thickness thicker than the neck. Appendix 46-3(f) states, "Weld joint details shall be in accordance...