Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: Xav1
  • Order by date
  1. Xav1

    Full height concrete abutment walls subjected to scour

    I have a question on this though: When a particular scour depth is provided as in the sketch above, how do we determine the extent of wingwall, as scour does not only happen in front of the abutment (horizontal extent of scour back of the abutment). We need to retain earth and protect the...
  2. Xav1

    Positive moment connection

    Relative settlement with respect to adjacent piers would also add to positive moment at a pier. Are you seeing these as well? If so, sometimes these can be reduced based on geotechnical studies. Depends on project specs and the DOT involved too I guess. Reduction of settlement effects can also...
  3. Xav1

    Bridge resources for Technicians (drafting)

    HI All, We have several very good people helping us with drafting, recently hired, who are new to doing works on bridges. I was wondering if there are any good references or books that I could share with them preferably dealing in a conceptual manner. Some concepts that are particular to...
  4. Xav1

    Standard bridge details & good v bad practice guides etc

    For approach slabs, recently I found this collection of information: Link

Part and Inventory Search