With fluid friction added to the equation, does the rest of the logic appear correct in calculating the backpressure on the formation due to the tubing load?
I appreciate the help.
I have what I believe to be a fairly simple fluid dynamics question, but I’m struggling to understand the mechanics at play in the wellbore.
Assume you have a well producing up tubing only (Casing Shut-In, No Packer). As depletion occurs, the well begins to load resulting in an increase in...