    Cantilevered Wood Diaphragm

    Exactly! Thanks ! @jayrod12
  2. ltfdrsn

    Cantilevered Wood Diaphragm

    @jayrod, There are walls above sitting on the shown diaphragm but not at the cantilevered section.
  3. ltfdrsn

    Cantilevered Wood Diaphragm

    Hi @Jayrod12, I attached the sketch. Thank you, http://files.engineering.com/getfile.aspx?folder=f469857c-fe07-4437-9010-b2e3d6103f51&file=2018_04_11_12_34_26.pdf
  4. ltfdrsn

    Cantilevered Wood Diaphragm

    Hi, I am designing a flexible wood floor diaphragm with a deck. So essentially, the deck will be having a cantilevered diaphragm because there is no shear wall below the cantilevered part of the deck. I would like to get some tips about how to approach to a condition like that. I was planning...
  5. ltfdrsn

    Top Flange Brace - Edge Beam

    Hi, I am designing a steel edge beam 28ft long, which will only take 2' of trib. load. There will be a concrete on metel deck placed on top of it. I was planning to design the wide flange beam as fully braced on the top. I was just wondering if there is an objection to that or not. Thank you,
  6. ltfdrsn

    Welded Stud Bolts - Wood Diaphragm Shear

    Hi, I have a shear wall sitting on a HSS Tube. I have two nailers on each side of the tube, which transfer the shear from the flexible diaphragm. The nailers are connected to the tube with 5/8 Dia. welded stud bolts. The shear at the wall is not more than 340 plf. Since there are two nailers on...