Should the ceilings in a hospital have an importance factor = 1.5 with regards to ASCE chapter 13 calculations? From section 13.1.3, the Ip is 1.5 for:
"The component is in or attached to a Risk Category IV
structure, and it is needed for continued operation of the
facility or its failure could...