@LittleInch
Vessels are not stamped but they are in total compliance with ASME code (materials, NDE, mech. calculations, welding and so on).
Then PED certificated.
Edit: forgot to mention no U-1 (MDR) needed
Hope it's more clear
S.
Here to point out that PED doesn't necessary mean that EN13445 needs to be considered.
Calculation code doesn't matter as long as you are in compliance with PED requirements.
For example, we usually manufacture PV & HE for EU market designed acc. to ASME VIII div.1 and PED certified.
Since you...
Check local shell thk. on the bottom right: there you can add the local shell thickness to be considered for the nozzle calculation which is your lip thickness.
For the width of the lip, I would limit the material contributing to nozzle reinforcement by adding your lip outside diameter as...