Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. crcivil

    Caltrans SNAILZ Download Help Needed

    Thank you PEinc.
  2. crcivil

    Caltrans SNAILZ Download Help Needed

    Hello, I've been trying to find a site from where to download the SNAILZ software program for soil nail design without success. Does anybody know where I can get it from? (I've tried Caltrans site already). Best regards and thank you in advance for your kind help.
  3. crcivil

    At Rest Vs Active Soil Pressure... Bottom of Wall moving.

    You could even reinforce the top of your fill through soil pinning, which employs the same technology as in rock bolting.
  4. crcivil

    At Rest Vs Active Soil Pressure... Bottom of Wall moving.

    StructuralEngineerTX, "My issue is that nowhere have I found something that says the bags won't eventually burst or disintegrate and hence I'm being careful by assuming eventually there will be lateral pressure on the wall." If you use geotextile bags, it will take more than a hundred years...
  5. crcivil

    Deep anchor near the failure plane

    FixedEarth, It would be worthwhile for you to try and ask for an easement permission. Once you get it (I don´t see why you wouldn't), your client will be happy to hear the good news and you can go on with a more practical solution by installing your tie-backs. I mean, talking doesn't hurt, does it?
  6. crcivil

    Top-to-Bottom Element Walls for Basement Construction

    How about top-to-bottom basement walls construction? In this case, the total length of the anchors being installed at every new lift is literally within the passive wedge zone, so why should we bother in considering a free length then? When we prestress the anchor in this situation, what we are...
  7. crcivil

    Top-to-Bottom Element Walls for Basement Construction

    Thank you very much PEinc. Still trying to figure out statements like the following by Harry D. Schnabel: "When tie-backs are used to stabilized a landslide, there may be no reason for an unbonded length. Since the failure surface is just that, it may even be desirably to bond the tie-backs on...
  8. crcivil

    Top-to-Bottom Element Walls for Basement Construction

    From Anthony D. Barley of SBMA: "It is widely acknowledged that, in the majority of circumstances where conventional anchors are used, debonding at the tendon/grout or the grout/ground interface must occur as anchor load increases and prior to any load being transferred to the distal end of the...
  9. crcivil

    Top-to-Bottom Element Walls for Basement Construction

    As for the two-stage method you've mentioned and agreed upon (I have employed it btw), at the end we don´t leave any free length either since the strands are bare-grouted, so part of the loads will eventually be transferred to the active wedge anyway, and in that way there is a close analogy...
  10. crcivil

    Top-to-Bottom Element Walls for Basement Construction

    Thank you PEinc, However, I'd like to hear your opinion on the practice some sub-contractors follow (including myself) of designing and testing ground anchors with no unbonded length, and being succesfull at it project after project. As Harry Schnabel commented: "While we have not followed...
  11. crcivil

    Tieback Anchors at Water Table

    I assume we're talking about temporary anchors ACtrafficengr. Regards.
  12. crcivil

    Tieback Anchors at Water Table

    dcarr82775, There is no way to know for sure if you can or can not work through open holes until the contractor gives it a try. Even if the drawings do not allow it, if he demonstrates in the field that it can be done, I don´t see why he should have any restriction for doing the job his own...
  13. crcivil

    Retaining wall remediation using soil nails and hard structural facing

    sadmoe, Since Soil Nails are pasive reinforcing elements you shouldn´t worry about strucural failure caused by point loads. However, it is a good idea to "activate" these nails to a few tons of tension, which can be done with a torque wrench. You should also provide a reinforced concrete pad...
  14. crcivil

    Top-to-Bottom Element Walls for Basement Construction

    Harry Schnabel in Tiebcks in Foundation Engineering and Construction: "We don't want any portion of our anchors to be made in the soil between the wall and the critical failure surfce. The physical significance of the unbonded length is to assure that no tendon load is trnsferred into this...
  15. crcivil

    Top-to-Bottom Element Walls for Basement Construction

    Hold on hokie66, almost there. I Appreciate your patience.
  16. crcivil

    Top-to-Bottom Element Walls for Basement Construction

    For Top-to-Bottom Basement Construction, we have succesfully completed a few projects so far installing prestressed ground anchors through these Element Walls without any free length, and then fully grouting the anchor which is prestressed to 30 - 50 t with no problem at all. We believe that by...
  17. crcivil

    Top-to-Bottom Element Walls for Basement Construction

    As for the design of the fixed length of these temporary anchors, the load transfer from anchor tendon to the ground via grout the distribution of stress along the fixed anchor is non-uniform. As Anthony D. Barley has stated; "In the vast majority of anchors, when applying the initial load...
  18. crcivil

    Top-to-Bottom Element Walls for Basement Construction

    In this method, intermittent/alternate permanent reinforced concrete panels are placed in a down-ward process as the excavation continues, and new elements of typycal size 3 m x 3 m are installed employing one prestressed temporary anchor per panel, and constructing a stripe foundation beneath...
  19. crcivil

    Toe projection in Basement wall

    25%-30% Toe 70%-75% Heel of total footing width I read it somewhere. Regards.
  20. crcivil

    Frozen Clay fill

    To run out of money before completing the job?

Part and Inventory Search