Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. luklyz

    Hydrocad and infiltration

    Hi Sorry for slow respond. You are right with everything. Everything has to be for 2 year event 2.90"/hr. The site is 3.108 ac, grassy field with flow path 330 ft (from SE to NW) CN=39, slope 1.3%, TC= 2.4 min. On the edge of the property there is a ditch (is going a round the property S to E...
  2. luklyz

    Hydrocad and infiltration

    hi Sorry for confusion. I have 0 cfs in pre development and i need to infiltrate 60% of pre in post conditions.
  3. luklyz

    Hydrocad and infiltration

    i thought about infiltration depth but my runoff depth is 0.
  4. luklyz

    Hydrocad and infiltration

    hi This is great forum. I'm new to Hydrocad and i have a issue with a infiltration. I have a parcel 3.108 ac. in central Wisconsin. Wisconsin code stands that for high imperviousness sufficient runoff volume of the post- development infiltration volume shall be at least 60% of the...

Part and Inventory Search