I am working on a home remodel where I will potentially have to cut into a post tension slab in order to place a new footing. Is there any issue in cutting the tendons to add this footing and then re-tensioning them once the new footing is set?
I have a potential client who wants to get a repair plan from me (structural) for the connection of a gangplank to a small river dock. The connection seems fairly simple, just a channel and some bolts to the wood framing of the dock, but what is the loading I should use for it? Are there...