    Oil & Gas Plant/Facility Phased project construction, deliverable drawing numbering & rev ha

    im curious how you folks handle drawing numbering and rev handling of multi phased projects that have overlapping areas? Im used to (in the mech and elec disciplines) having the initial phased project drawings that may have been IFC'd for phase one, get rev'd up for phase 2. reving up the...
  2. PipeStretcher

    P&ID Header / Branch configuration Schematically represented vs actual in the field?

    The question is "should a P&ID be schematically accurate in configuration to whats in the field"? or, does it not matter? The P&ID should have been followed, the piper is at fault or should have went to the engineer to confirm it was ok to change, then push the change to the P&ID.
  3. PipeStretcher

    P&ID Header / Branch configuration Schematically represented vs actual in the field?

    Hopefully i can fully communicate the question i have. ***The question is "should a P&ID be schematically accurate in configuration to whats in the field"? or, does it not matter?*** I have been a Piping Designer for the last 20 years. Ive spent quite a bit of time in the field walking down...
  4. PipeStretcher

    Mechanical & Piping Facility / Plant Deliverables & Review cycles

    im curious to know what you guys typically deliver to your clients at 30%, 60%, 90% and IFC milestones? PFD's, P&ID's, One line plan, GA or equip location plan, Piping plans and sections, Isometric drawings for installation or fabrication, etc.