Units are not suitable for recertifying.
I vision a tunnel with 3 wires spaced across 3/4 of the width of the tote with each wire having a splay blade immediately behind it to keep the parts separate.
Do you know of a company that has any involvement with Hot Wire production equipment?
There is a need to process a tote every 7 minutes to feed a Crusher / Shredder which then feeds a pelletizer to generate a saleable recycled raw material.
Also a desire to minimize the amount of labour.
Do you think that a hot wire cutter set-up would be an achievable objective?
I am looking for help in ascertaining if a large hollow HDPE (330 Gallon Tote – metal frame removed) could be cut with a hot wire prior to shredding.
I envisage it being pulled/pushed through a tunnel with 1 - 3 vertical wires.
Any advice you could give me would be appreciated.
This would be...
I am looking for help in ascertaining if a large hollow HDPE (330 Gallon Tote – metal frame removed) could be cut with a hot wire prior to shredding.
I envisage the tote being pulled/pushed through a tunnel around 1 to 3 vertical wires.
Any advice you could give me would be appreciated.
I am looking for help in ascertaining if a large hollow HDPE (330 Gallon Tote – metal frame removed) could be cut with a hot wire prior to shredding.
I envisage the tote being pulled/pushed through a tunnel around 1 to 3 vertical wires.
Any advice you could give me would be appreciated.