Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations SSS148 on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. watertreatmentpro

    Discharge Static Head

    I actually think you have to design for two conditions (A) start-up and (C) duty. Look at your system curve for the two and size your pump accordingly. At start-up the pump must have enough power to lift the water up the the full height of the hill before it can take advantage of gravity and...
  2. watertreatmentpro

    Aeration Basins for Chlorine Contact Tanks

    The client wants to use their existing system/equipment - otherwise we would recommend something other than dosing with chlorine for effluent discharge.
  3. watertreatmentpro

    Aeration Basins for Chlorine Contact Tanks

    Has anyone heard of WW packaged plants (1.5 MGD) utilizing a portion of its existing aeration basins (with course bubble diffusers) as chlorine contact tanks? It appears that the aeration system is used for mixing to achieve a 1.0 Baffling Factor in lieu of actual intra-basin baffles. We are in...

Part and Inventory Search