Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. sgs114

    Concrete On Metal Deck - Concrete Strength + Min Composite Action

    Hello, I have a project where we have a concrete on metal deck floor with composite steel beam framing. We had specified f'c = 4000 psi on our drawings, and the mix design we received in the submittal had a listed min f'c = 6000 psi with pretty much all of the test data coming back in excess...
  2. sgs114

    Torsion Restraint on Steel Beam

    Hello, I have a unique condition that I am not sure how to address some torsion that I am putting on an (E) WF Beam. The beam is spanning across an opening and we want to put a track on top of for some equipment. The equipment load does not align with the centerline of the beam, so there is...
  3. sgs114

    Sub-Diaphragm - Partial Length CMU Wall

    Plan is below: https://res.cloudinary.com/engineering-com/image/upload/v1596033362/tips/Plan_f3tkhz.pdf Seems like maybe the cross tie is purely a diaphragm element and having it anchored to my wood wall for out of plane isn't specifically required. It is just used to distribute the forces to...
  4. sgs114

    Sub-Diaphragm - Partial Length CMU Wall

    Hello, I have a project with a rectangular building foot print of 66' x 120'. It has a wood diaphragm on the roof and wood (shear)walls in the long direction. In the short direction I have (2) 20' long CMU shear walls and wood framed walls for the remainder. The CMU shear walls are not...
  5. sgs114

    Vehicle Transport in Slotted Holes

    Hello, I have a unique project I am working on which involves the construction of a fairly large pallet which will be loaded with some sensitive equipment that needs to be transported. The pallet is loaded onto a truck via the truck driving under the pallet and raising up it's platform until it...
  6. sgs114

    Transporting Equipment with Slotted Holes

    Hello, I have a unique project I am working on which involves the construction of a fairly large pallet which will be loaded with some sensitive equipment that needs to be transported. The pallet is loaded onto a truck via the truck driving under the pallet and raising up it's platform until...
  7. sgs114

    Rooftop Penthouse Design

    Hello, I have a question with regards to the design of rooftop penthouses. When designing these rooftop structures, do you typically (won't say always) use Section 13.3 for design of the structure regardless of what your lateral system of the roof top structure is (ie cantilever column or...
  8. sgs114

    Short-Term Moonlighting Question

    Hello, I have recently decided to perform some structural engineering services moonlighting from my main work. I don't foresee continuing this for more than a year, so my main question is about liability insurance. I have looked into E&O insurance through ASCE and have a quote for a one year...
  9. sgs114

    Bridge - Structural Fill Approach

    Hello, I am working on a steel access bridge project that is under the jurisdiction of the US Forestry Service. The bridge is crossing a stream and will be composed of a steel grating deck with (2) steel WF girders. The requirement of the forestry service is to have 2' of free-board above the...
  10. sgs114

    Alaska Cedar NLT Panels In Exterior Conditions?

    Hello, I had posted about a bridge question I had earlier, and got some good suggestions as far as bridge deck. I was also looking into using Alaska Cedar NLT panels for the bridge deck. Researching NLT panels, it seems as though moisture content (wood swelling) is of quite concern. My...
  11. sgs114

    Bridge Loading

    Could either of you recommend a decking material? The location is fairly remote, so access is not super easy. Per the project specs, we are only to use un-treated lumber, steel, or concrete. We have a 30' span and 15' wide bridge. I was thinking cedar planks, but I don't think those would be...
  12. sgs114

    Bridge Loading

    Hello, We are working on designing a bridge for a maintenance road where the only traffic would be snow-mobiles or a gator w/ trailer to tow equipment. We do not typically do bridges, so I am trying to determine how I can classify the bridge and determine the applicable live load required...
  13. sgs114

    ASCE 12.2.4 vs 12.2.3.1

    Hokie So even if my pilasters are not part of the lateral system on the base level you still think it is required to amplify the forces by my ratio of R-values? It seems odd that I suddenly have to design my base level columns for loads that are 60% larger than the loading on the floor above...
  14. sgs114

    ASCE 12.2.4 vs 12.2.3.1

    Hokie, What do you think the intent of Section 12.2.4 is? It mentions designing members common to the different framing systems using the requirements of the highest response modification coefficient, R. It seems to me like my pilasters would be designed using the requirements (loading) from...
  15. sgs114

    ASCE 12.2.4 vs 12.2.3.1

    Hello, I have a question in regards to load application for a building with vertical combinations of lateral force resisting systems. My building is 6 stories with buckling restrained braced frames on levels 2-6 and CMU walls at the base. My question is in regards to the transfer of...
  16. sgs114

    Horizontal Irregularity Type 4 and Combination of Framing Systems

    Hello, I am working on a building that is a 6-story office building. The lateral system for levels 2-6 are Buckling Restrained Braced Frames and the lateral system for the base level is CMU walls around the perimeter. Working through the design, I have encountered various items that appear (to...
  17. sgs114

    ASCE 7-10 Two Stage Procedure

    Hello, I am working on a building that is a 6-story office building with buckling restrained braced frames on levels 2-6 and CMU shear walls at the first level. My building is torsionally irregular, so I am forced to do a response spectrum analysis. Looking at the two-stage procedure...
  18. sgs114

    Simpson Hold-down Nominal Capcities

    Hello, We are doing an ASCE 41-13 upgrade to a wood building and need to add hold-downs to the ends of some shear walls to resolve the overturning forces. All Simpson holdown values published are allowable loads and we need to convert them to the nominal value. Does anyone have any references...
  19. sgs114

    ASCE 41-13 Seismic Upgrade Force Levels

    Hello, We are doing an ASCE 41-13 Tier 3 seismic evaluation of an existing building to the Immediate Occupancy performance level. We are using the linear static procedures and per the client's request, we are using the BSE-1N and BSE-2N seismic hazard levels for our analysis. When using this...

Part and Inventory Search