Hi
We have tow pipelines of 500 meter transporting NAPHTA and Jet Fuel were initially underground and after several years of operations we are planning to replace them due to corrosion. My question is if we change them to above ground , is there any risk or restriction that may affect its...
Hello Sir
Thank you for your quick reply and sorry for not providing as many details. This is an old central pumping station receiving oil from different remote stations and the facility piping and associated equipment suffering severe corrosion at some areas due to lack of maintenance and...
Dear Engineers and experts
We have a multiple wash and storage tanks venting to common line to flare. This line suffered overpressure due to blockages cuased by accumulation of impurities leading to instability operation of these tanks and malfunctioning of the breather valves.
Note that...
Hi
Thank you for your response. I actually looking for ways to evaluate the performance of a demulsifier in making separation improvement of water from Oil and minimise oil losses base on daily oil/water production, BS&W and salt content. In other words, i want to build a model in excel to see...
Hello
Can anyone help me with this:
I am trying to evaluate our chemical ( demulsifier) efficiencies at different production stations and Oil recovery efficiency as well. Could you please advise if you have any resources calculating such parameters ( equations used and details of...
Thank you very much for your reply. Could you please advise in case I install this heater at the station that produced higher rates of water ( high salt). What are the risks I'll be facing? What are the parameters I need to watch to get a proper design?
For information the suggested heater...
Dear Experts/Engineers
In our Oil field facilities we are facing high level of salt (> 60 PTB) in the shipped oil, in particular during cold periods of the year. Here is a summary of the issue:
We have 4 producing stations ( each station has a 3 phase production separator, a wash and surge...
Hi experts & engineers
I work in an Old oil facilities where old systems are used. Currently we are facing a challenge on running electrical Oil shipping pumps. Here's a summary of this issue:
The facility produces 12K BBLS of Oil per day through a 20'' shipping line to another terminal by...