Guys you are absolutely right. This section of ASME B31.3 that says that you must compare the hoop stresses occurred during hydrotest to the yield strength, I had missed.
Thanks for the guidance.:cool:
Hello Everyone,
I have a question regarding the Hydrotest procedure of some piping lines connected to a compressor. The compressor has 8 stages and the Suction design data of those stages are the following:
Stage 1: Temperature: 80 deg. C Pressure: 2 bar Hydrotest Pressure: 3 bar
Stage 2...
Thank you all for the prompt replies,
The manifold will be about 25m in length, the flow comes from the one side at pressure of 5 bar and the other side has a cap. In the photo below you can see a preliminary arrangement just to get a feeling of what we are talking about. Thank you again [bigsmile]
Hello to all,
I need your insight regarding the procedure I should follow in order to size a Cooling Water Supply and a Cooling Return Manifold.
The Supply manifold feeds water to 6 Coolers, all located very close to one another. The Vendor of the Coolers has given info regarding how much...