Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations SSS148 on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. L

    Simulation using Petrel

    Hello everyone, hope you are fine. I am developing a model using PETREL, but i need the production curves until a production unit, i.e. flowing from the reservoir, going to the wellhead and a pipeline unitl a positioned production unit. My doubt in this moment is if I am able to do this only...
  2. L

    Technical Requirement for phasing production projects

    When planning the development field, in forecasting and simulations phase, analyzing the predicted curves and aiming to improve the production. What analyses can I make to make shure that it is necessary to add a pump or a separator?
  3. L

    Technical Requirement for phasing production projects

    Hello everyone, I would like to know the technical requirements used to phasing a exploration and production subsea project. Which criteria to analyze to add, after start the first oil production, a separator, booster, compressor and so on? Is it the water cut, decline curve?

Part and Inventory Search