  1. fadre

    STRUCTURAL ANALYSIS OF TEMPORARY BOARD-UP

    Oh wow. Thanks so much @MIStructE_IRE This is such a good reference. These are hard to find. Appreciate it.
  2. fadre

    STRUCTURAL ANALYSIS OF TEMPORARY BOARD-UP

    And to answer your question, yes I have to analyze the whole system.
  3. fadre

    STRUCTURAL ANALYSIS OF TEMPORARY BOARD-UP

    Thanks so much @winelandv I'll actually be computing this with a structural engineer tomorrow. I actually want to transition to structural engineering which is why I just wanted the general procedure for this. For sure I won't let them build this if it is unsafe to start with. Thank again, I...
  4. fadre

    STRUCTURAL ANALYSIS OF TEMPORARY BOARD-UP

    There's a proper way of saying it then. I get your point but the other guy didn't have to be sarcastic. I mean I'm trying to learn here. I'm trying to analyze it so I could check if it's capable. Come on guys, I just need some help.
  5. fadre

    STRUCTURAL ANALYSIS OF TEMPORARY BOARD-UP

    I guess I'll have to start from the GI sheet-purlins-GI pipe-Steel bar? I'll have to analyze them one by one?
  6. fadre

    STRUCTURAL ANALYSIS OF TEMPORARY BOARD-UP

    That's actually a rebar behind the sign. Welded to a GI bar. I wasn't the one who designed it, they just asked me if I could compute it. I just wanted to learn how really. Thank you for the ones who aren't making fun of my thread. I went here for help, not sarcastic answers. :)
  7. fadre

    STRUCTURAL ANALYSIS OF TEMPORARY BOARD-UP

    No I'm not which is why I'm having a particularly hard time with this task.
  8. fadre

    STRUCTURAL ANALYSIS OF TEMPORARY BOARD-UP

    I've been given the task of structurally analyzing this board up but I'm having a hard time figuring out the process. I've already calculated for the windload but i don't know where to go from there. Sorry if it's such a basic question. Thanks in advance.